05.12.23

Technical note 14 – Insulation in the external wall cavity – Good practice checks

05.12.23

Technical note 12 – Cavity barriers around openings

05.12.23

Technical note 15 – Gable panel forces – explanation

05.12.23

STA consumer guide 2 – Mortgage advice

05.12.23

Technical note 13 – Fire safety building terms briefly explained

05.12.23

Technical note 11 – Structural timber building design loading clarification

05.12.23

Fire mitigation product paper 5 – Appendix 5 – Separation distance tables; key notes and advice

05.12.23

Fire mitigation product paper 5 – Appendix 4 – Using separation distance tables on sites with phased handover

05.12.23

Fire mitigation product paper 5 – Appendix 2 – How to use the PP5 separation distance tables

05.12.23

Fire mitigation product paper 5 – Appendix 3 – Using separation distance tables on sites with multiple units

05.12.23

Fire mitigation product paper 5 – Appendix 1 – Determining overall project size/threshold

05.12.23

Technical note 08 – Temporary work platforms over voids – during construction of structural timber buildings